Philippine Railway Project - Drive up to the stop marker at each terminus to switch tracks
| Past | Avg. CCU | Visits | Avg. Session Length | Avg. Daily Revenue |
|---|---|---|---|---|
| 7 days | .011 -50.83% | 46 -11.54% | 0.3 minutes -69.50% | — |
| 28 days | .017 -72.53% | 192 -53.28% | 0.63 minutes -62.75% | — |
| 91 days | .031 -51.59% | 876 -56.22% | 0.95 minutes -45.03% | — |
| 364 days | .085 | 9.7K | — | — |